Summer Refurbishment Works
A number of rooms are prioritised for upgrade during summer 2012. The works vary in scope from new furniture and AV to major refurbishment and will continue to ensure a minimum standard across all teaching rooms.
The works consist of:
Rooms Moving to Central Management
- Enabling works to facilitate audio visual improvements, as part of the technical upgrade of these rooms over the period summer 2012 to summer 2014
- New furniture, carpets, whiteboards, where required.
Other Rooms
David Keir Building: LG115 and 01.028
- Refurbishment of the existing benches with new upholstered seating
- Replacement of floor finishes
- Replacement of windows with new double glazed units and new blackout blinds.
- Installation of a new suspended ceiling system
- Replacement of the lighting installation including emergency lighting and fire alarm
- Installation of a bespoke lectern housing new audio visual equipment
- Replacement of black boards and screens with a glass panel system suitable for projection and writing.
David Keir Building: Rooms 01.522, 0G512, 0G.530, 01.533, 03.517 and 03.532
- Works to improve the student experience, addressing issues of layout, flexibility (independent and group study space), audibility and visibility.
Bernard Crossland Building: Rooms 02 003, 0G 024, 0G 025, and 16 Malone Road 0G 003/004
- Refurbishment to provide learning and teaching space that will support timetabled group study and independent project work.
MBC North and South Lecture Theatres 0G.008 and 0G.046
- Refurbishment of the existing upholstered seating
- Replacement of floor finishes
- Replacement of wall finishes including profiled timber strip cladding.
- Installation of a new suspended ceiling system (South LT)
- Replacement of the lighting installation including emergency lighting (South LT)
- Installation of a bespoke lectern
Peter Froggatt Teaching Centre
- Concrete repairs to external cladding & sealing windows
- Refurbishment of toilets to upper floors
- Increased insulation to lower roof level
As part of the refurbishment, Media Services will be upgrading the AV equipment in a number of rooms. Information about the rollout of AV equipment can be seen here.