Skip to Content

Output

Walkability Workshops

As part of the projects dissemination strategy the project team has been visiting various local government bodies around the UK.  These workshops included a number of presentations outlining different aspects of the project.  The PowerPoint slides for each of the workshop sections can be downloaded in PDF format below.

Part 1: The KESUE Project
Part 2: Understanding Walkability
Part 3: Developing the Real Walkable Network
Part 4: Case Studies & Applications using the Real Walkable Network

Accessibility Map showing 800m for GP Surgeries in Belfast

 

Accessibility Atlas

The project has created a detailed Accessibility Atlas showing hinterlands to over 30 commonly accessed services in both Belfast and Derry/Londoderry.  The main aim of this piece of work was to stimulate engagement with our project partners and to demonstrate some potential avenues of analysis with them.

This document can be accessed for either Belfast or Derry/Londonderry upon request from by emailing:g.ellis@qub.ac.uk

KESUE Final Report

The final report of the findings of the KESUE project can be downloaded below:

KESUE: Final Report